以1984—2013年中国PPP的省域面板数据为基础,描述和分析了中国PPP项目发展的时空格局和特征,并利用地理探测器对PPP发展空间分布差异的影响因素进行识别和测度。研究发现:1984年以来中国PPP发展历程可分为四个阶段,PPP项目总体呈现波动增长趋势;空间上PPP项目分布存在显著的非均衡性,总体呈现东部多中西部少的格局;GDP、城镇化率、财政收入和资金总量等因素通过交互作用共同影响了中国PPP的发展,但在影响程度上存在差异。该研究为开展PPP相关研究提供了新的视角与方法,也为中国PPP可持续发展提供了有益启示,同时为PPP模式的宏观决策提供了参考,建议PPP政策的制定和实施要立足中国发展不平衡不充分的现状,因地施策。
As a delivery model in urban infrastructure, PPP has been widely used worldwide and also has a long application history in China. To achieve the sustainable development for PPP, it is necessary to review the development process of PPP and learn the lessons of PPP in China. This paper in first establish the PPP projects database through open search engine, and then explore the spatio-temporal pattern of PPP in China during last 30 years. At last, this paper identifies, measures and analyzes the drivers of PPP in China. The result indicates that China's PPP development have exist four stages with the characteristics of spatial differentiation. The space heterogeneity of PPP development is depend on the interact of GDP, urbanization, capital sum and fiscal revenue. This paper tries to helping Chinese national and local governments make more reasonable policies, as well as laying foundation for further empirical research of PPP in China.
[1] 赵燕菁. 土地财政:历史、逻辑与抉择[J]. 城市发展研究,2014(1):1-13.
[2] Zhang S,Gao Y,Feng Z,et al.PPP application in infrastructure development in China:Institutional analysis and implications[J]. International Journal of Project Management,2015,33(3):497-509.
[3] 王守清,柯永建. 特许经营项目融资(BOT、PFI和PPP)[M]. 北京:清华大学出版社,2008.
[4] Wang H,Xiong W,Wu G,et al.Public-private partnership in Public Administration discipline:a literature review[J]. Public Management Review,2017:1-24.
[5] Jang W,Lee D,Choi J.Identifying the strengths,weaknesses,opportunities and threats to TOT and divestiture business models in China's water market[J]. International Journal of Project Management,2014,32(2):298-314.
[6] Mu R,de Jong M,Koppenjan J. The rise and fall of Public-Private Partnerships in China:a path-dependent approach[J]. Journal of Transport Geography,2011,19(4):794-806.
[7] Roumboutsos A,M. R. Macário R. Public private partnerships in transport:theory and practice[J]. Built Environment Project and Asset Management,2013,3(2):160-164.
[8] Sobhiyah M H,Bemanian M R,Kashtiban Y K.Increasing VFM in PPP power station projects-Case study:Rudeshur gas turbine power station[J]. International Journal of Project Management,2009,27(5):512-521.
[9] Renda A,Schrefler L.Public-private partnerships. Models and trends in the European Union[J]. European Parliament’s committee on Internal Market and Consumer Protection,2006.
[10] Hwang B G,Zhao X B,Gay M.Public private partnership projects in Singapore:Factors,critical risks and preferred risk allocation from the perspective of contractors[J]. International Journal of Project Management,2013,31(3):424-433.
[11] Vining A R B. Public-private partnerships in Canada:Theory and evidence[J]. Canadian Public Administration,2008,51(1):9-44.
[12] Medda F.A game theory approach for the allocation of risks in transport public private partnerships[J]. International Journal of Project Management,2007,25(3):213-218.
[13] 赖丹馨. 基于合约理论的公私合作制(PPP)研究[D]. 上海:上海交通大学,2011.
[14] 陈曦,王松江. 基于霍尔三维结构模型的城市水务业项目融资模式研究[J]. 项目管理技术,2010,8(12):30-37.
[15] 陈浩,袁竞峰,张星,等. 基于贝叶斯网络的PPP项目残值风险研究[J]. 项目管理技术,2012(3):22-26.
[16] 梁伟,王守清. 实物期权在城市轨道交通PPP项目决策中的应用[J]. 工程管理学报,2012(2):23-27.
[17] 王劲峰,徐成东. 地理探测器:原理与展望[J]. 地理学报,2017,72(1):116-134.
[18] Wang J,Li X,Christakos G,et al.Geographical Detectors-Based Health Risk Assessment and its Application in the Neural Tube Defects Study of the Heshun Region,China[J]. Int. J. Geogr. Inf. Sci,2010,24(1):107-127.
[19] Wang J,Hu Y.Environmental health risk detection with Geog-Detector[J]. Environmental Modelling & Software,2012,33:114-115.
[20] 丁悦,蔡建明,任周鹏,等. 基于地理探测器的国家级经济技术开发区经济增长率空间分异及影响因素[J]. 地理科学进展,2014,33(5):657-666.
[21] 朱鹤,刘家明,陶慧,等. 北京城市休闲商务区的时空分布特征与成因[J]. 地理学报,2015,70(8):1 215-1 228.
[22] 湛东升,张文忠,余建辉,等. 基于地理探测器的北京市居民宜居满意度影响机理[J]. 地理科学进展,2015,34(8):966-975.
[23] 毕硕本,计晗,陈昌春,等. 地理探测器在史前聚落人地关系研究中的应用与分析[J]. 地理科学进展,2015,34(1):118-127.
[24] 刘彦随,杨忍. 中国县域城镇化的空间特征与形成机理[J]. 地理学报,2012,67(8):1 011-1 020.
[25] Li B.Risk management of construction public-private partner-ship projects[Z]. Glasgow Caledonian University,2003.
[26] Hwang B,Zhao X,Gay M J S. Public private partnership proj-ects in Singapore:Factors,critical risks and preferred risk allocation from the perspective of contractors[J]. International Journal of Project Management,2013,31(3):424-433.
[27] Chan A P C,Lam P T I,Chan D W M,et al. Drivers for Adopt-ing Public Private Partnerships-Empirical Comparison between China and Hong Kong Special Administrative Region[J]. Journal of Construction Engineering and Management,2009,135(11):1 115-1 124.
[28] Mota J,Moreira A C.The importance of non-financial determi-nants on public-private partnerships in Europe[J]. International Journal of Project Management,2015,33(7):1 563-1 575.